Let’s start a project

 

Get your compliance testing quote!

For a comprehensive and competitive quotation please provide the following information about your product and the test requirements.

Product brochures, photographs, existing reports and specification sheets are useful if available (please use the file upload buttons at the bottom of the form to upload files). Only basic fields are mandatory, however, submission of detailed information will enable a more accurate quote and faster turn around (less back and forth with sales consultants & experts).

We endeavour to respond within 24 to 48 hours however at peak times this may not be possible. If you have not received a response from a sales consultant within a few days, please call us on +03 9365 1000 to follow up.

FEEL FREE TO PHONE IF YOU WANT TO TALK TO A HUMAN.

 

Request A Quote - Three options
Whats your preferred method of contact
Please note that if you complete any form with hidden fields and then change this choice the hidden entered field data will be lost.

Your Contact Details

Required services & intended markets

Required service(s)
Markets intended for sale (Enter the country or compliance in the space below if required)

Required services & intended markets

Required service(s)
Markets intended for sale (Enter the country or compliance in the space below if required)

Your Product Information

Volts, Amps, Frequency, No. Phase etc.
Volts, Amps, Frequency, No. Phase etc.

Cables and ports

Sheilded cable

Wireless radio technologies used in your product

Does your product communicate data via a wireless connection such as Bluetooth, Wi-Fi, 4G etc.
Type of RF module(s) transmitters/receivers (Enter details for "others" in the space below if required)

EMC Testing details

Including any CPU, ICs & RF transmitters/receivers
Is immunity testing required (REQUIRED for CE mark testing for Europe, typically not for Australia or North America)

EMC Testing - Immunity testing

Typically the dwell time is 3 seconds for testing
Depends upon product standard and product build, select '0' if unknown.
Typically for cables >3m in length or power ports
cables >30m or leave the building directly or connect directly to cables leaving the building.

Site survey

Site survey address
Site survey address
City
State/Province
Zip/Postal
Country

Calibration details

Accredited calibration

Timelines

Preferred Test Lab Location & Additional comments

All accredited Calibration & SAR testing will be performed at our head office, i.e. EMC Technologies Melbourne (NW). If required the product can be transported between labs (depending upon size and weight) at no additional cost. Other testing can be performed at multiple sites, please select your preferred laboratory (optional locations)

Additional information and comments

Attachments

This may include product brochures, test reports, test plans etc.

Maximum file size: 10MB

Join our mailing list to receive the latest news & updates from our team.
Website Privacy Statement and Terms & Conditions *
Links to view the Privacy Statement and Terms & Conditions are in the footer of each page of this website (Company information).
GET A QUOTE